beautypg.com

Port commissioning deployment results – Brocade Network Advisor SAN + IP User Manual v12.3.0 User Manual

Page 766

background image

694

Brocade Network Advisor SAN + IP User Manual

53-1003155-01

Port commissioning

14

NOTE

You can only recommission ports from the logical switch, not the physical chassis.

While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to

“Viewing a

port commissioning deployment report”

on page 695).

When the recommission is complete, an application event displays in the Master Log detailing
success or failure.

Port commissioning deployment results

FIGURE 282

Port commissioning deployment results

The Deployment Results contains the following data: