Figure 9-4 – Dell Emulex Family of Adapters User Manual
Page 1312

OneCommand Manager for VMware vCenter Version 10.2 User Manual
P010089-01A Rev. A
9. Diagnostics
LightPulse FC HBA Diagnostic Tests
1312
Figure 9-4 D_Port Tests Dialog Box
The D_Port tests are launched. If all tests pass, a dialog box similar to Figure 9-5 is
displayed. If all tests do not pass, the Failed result in shown in the Test Phase
Results. See Figure 9-6 for an example.
Click Save Results to File to save the test results to a text file. You can view this text
file in any text editor.
Notes
To stop tests, click Stop Test.
The D_Port tests can take an extended period of time to complete.
If the Overall Test Result is "FAILED", you need to either re-run the tests
successfully or reset the HBA port to bring the link back up.
If an older version of an SFP is used in an adapter's port, which does not fully
support all D_Port tests, some of the test phase results report skipped. If an
older SFP version is detected by the OneCommand Manager for VMware
vCenter, a message is displayed under the results box indicating that the SFP
version does not fully support all D_Port tests.
If a test phase fails, the D_Port diagnostics are automatically stopped. In this
case, some of the phases may not be reported in the results. However, the failed
phase will be reported.