beautypg.com

3working with the fb editor – Lenze E94A User Manual

Page 99

background image

Lenze · 9400 function library · Reference manual · DMS 6.7 EN · 08/2014 · TD05

99

3

Working with the FB editor

3.8

Inserting complete interconnection from reference project

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Press Insert button.

• The button can only be activated if the device in the reference project has the same de-

vice type and version as the project device.

• After the button has been pressed, the module assembly is compared. If there are rele-

vant deviations, the insertion is refused and a corresponding message is displayed.

• If an insertion is possible, you are asked if the FB interconnection is to be inserted.

5. Confirm the question if the copied FB interconnection is to be inserted with Yes.

• The FB interconnection is inserted and the Insert from referential project dialog box is

closed.

• After the insertion, an update of the project is required.