Multitasking in the Servo Drive 9400

34

Lenze · 9400 function library · Reference manual · DMS 6.7 EN · 08/2014 · TD05

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Example of runtime measurement
In the following example, the ApplicationTask is called in a 1 ms interval. The ApplicationTask inter-

rupts the UserTask which is called in a 4 ms interval. Both tasks, in turn, interrupt the IdleTask. The

interruptions cause a runtime extension both in the UserTask and in the IdleTask. This means that

already a small runtime extension has a significant effect on the runtime of the other two tasks!

[2-10] Example: Runtimes of the different tasks

System task

Application task (here: Task interval = 1 ms)

User task (here: Task interval = 4 ms)

Idling idle task

T1 = runtime of the application task

T2 = runtime of the user task

T3 = runtime of the idle task

0

1 ms

4 ms

T1

T2

T2

T1

T1

T1

T1

T1

T3

1

0

2

3