5 communication phases/network management, Communication phases/network management, 9"can on board" system bus – Lenze 9400 User Manual
Page 302

9
"CAN on board" system bus
9.5
Communication phases/network management
302
Lenze · Servo-Inverter 9400 HighLine · Reference manual · DMS 10.0 EN · 11/2013 · TD05/06
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9.5
Communication phases/network management
Regarding communication via the system bus, the controller distinguishes between the following
statuses:
Tip!
Part of the initialisation or the entire initialisation can be carried out anew in every status
by transferring the corresponding network management telegrams.
Status
Explanation
"Initialisation"
(Initialisation)
After switch-on, an initialisation run is carried out.
• During this phase, the controller is not involved in the data exchange via
the bus.
• The standard values are re-written to all CAN-relevant parameters.
• After initialisation is completed, the controller is automatically set to the
"Pre-Operational" status.
"Pre-operational"
(before being ready for operation)
Parameter data can be received, process data are ignored.
"Operational"
(ready for operation)
Parameter data and process data can be received!
"Stopped"
(stopped)
Only network management telegrams can be received.
Communication object
Initialisation
Pre-operational
Operational
Stopped
PDO
SDO
Sync
Emergency
Boot-up
Network management (NMT)