Commissioning of the "Table positioning" technology application

64

Lenze · 8400 protec HighLine · Reference manual · DMS 3.0 EN · 03/2013 · TD05

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Commissioning steps
Below find a description of the commissioning steps of the "Table positioning" application shown in

illustration

[3-2]

.

Please observe the sequence of the steps in the following chapters and follow them through

carefully. This will help you to commission your controller quickly and as safely as possible:

Prepare controller for commissioning

Creating an »Engineer« project & going online

( 66)

Parameterising the motor control

( 67)

Parameterise application

( 68)

Saving parameter settings safe against mains failure

( 76)

Enable controller and test application

( 76)

3.8.1

Prepare controller for commissioning

1. Power connection wiring

• Refer to the mounting instructions supplied with the drive controller to find help on how to

correctly design the power connections to match the requirements of your device.

2. Wire the control connections

• The system constellation including position encoder and hardware limit switches shown in

illustration

[3-2]

requires wiring according to control mode "

Terminals 0

":

DI3

/DO1

DI4

/DO2

GIO

GIO

GIO

DI1

DI5

n.c.

n.c.

n.c.

DI2

DI6

X41

X42

X43







„

„

„

‚

‚

‚

…

…

…

ƒ

ƒ

ƒ

24O

24O

24O

+

+

+

+ 24 V

RFR

pos. direction

neg. direction

Limit switch

Profile no. 1/3

Start of profile generation

Controller enable

A
B

Position encoder