Lenze PROFIBUS Controller-based Automation User Manual
Controller-based automation, Ä.o5~ä
Table of contents
Document Outline
- Controller-based Automation - PROFIBUS®
- Contents
- 1 About this documentation
- 2 Safety instructions
- 3 Controller-based Automation: Central motion control
- 4 The Lenze automation system with PROFIBUS
- 5 Technical data
- 6 Commissioning of PROFIBUS
- 6.1 Overview of the commissioning steps
- 6.2 Detailed commissioning steps
- 6.2.1 Planning the bus topology
- 6.2.2 Installing field devices
- 6.2.3 Create a project folder
- 6.2.4 Commissioning the field devices
- 6.2.5 Creating a PLC program with a target system (Logic/Motion)
- 6.2.6 Configuring the communication parameters
- 6.2.7 Importing missing devices / device description files
- 6.2.8 Creating a control configuration (adding field devices)
- 6.2.9 Configuration of the PROFIBUS master
- 6.2.10 Configuring the PROFIBUS slave
- 6.2.11 Compiling the PLC program code
- 6.2.12 Logging in on the controller with the »PLC Designer«
- 6.2.13 Starting the PLC program
- 7 Mixed operation PROFIBUS with EtherCAT
- 8 Function libraries
- 9 Defining the minimum cycle time of the PLC project
- 10 Diagnostics
- 11 Parameter reference
- Index
- Your opinion is important to us
- Contents