Lenze PROFINET Controller-based Automation User Manual
Controller-based automation, Ä.o5^ä
Table of contents
Document Outline
- Controller-based Automation - PROFINET®
- Contents
- 1 About this documentation
- 2 Safety instructions
- 3 Controller-based Automation: Central motion control
- 4 The Lenze automation system with PROFINET
- 5 Technical data
- 6 Commissioning of the PROFINET
- 6.1 Overview of the commissioning steps
- 6.2 The commissioning steps in detail
- 6.2.1 Planning the bus topology
- 6.2.2 Installing field devices
- 6.2.3 Create a project folder
- 6.2.4 Commissioning the field devices
- 6.2.5 Importing missing devices / device description files
- 6.2.6 Creating a PLC program with a target system (Logic)
- 6.2.7 Configuring the communication parameters
- 6.2.8 Creating a control configuration (adding field devices)
- 6.2.9 Configuring the I/O device
- 6.2.10 Logging in on the controller with the »PLC Designer«
- 7 Mixed operation PROFINET with EtherCAT
- 8 Defining the cycle time of the PLC project
- 9 Diagnostics
- 10 Parameter reference
- Index
- Your opinion is important to us
- Contents