3 commissioning, Commissioning, 3commissioning – Lenze E94AxPExxxx User Manual
Page 26

3
Commissioning
26
Lenze · 9400 Servo PLC· Reference manual · DMS 4.0 EN · 11/2013 · TD05/06
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3
Commissioning
This documentation contains detailed information on parameter setting and configuration of the
controller. Sequential reading is not required.
In order to obtain the information relevant for initial commissioning, this chapter describes
different commissioning scenarios which can also be used as a guide through this manual:
A.
• Target: Adapting the controller to the electromechanics and the control system.
B.
• Target: Taking over the application and parameter set of an already preconfigured "Engineer"
project into several controllers.
C.
• Target: Replacing a controller which has failed in a running system by a replacement device
using the "old" memory module.
D.
• Target: Replacing a motor which has failed in a running system.