beautypg.com

254 (prep – Metrohm 746 VA Trace Analyzer User Manual

Page 405

background image

5.7 Program instructions

746 VA Trace Analyzer / 747 VA Stand

5-254

(PREP

Page:

O

Stand:

A

Abbreviation:

(P

Instructions t/s Main parameters Auxiliary parameters

––––––––––––– ––––– ––––––––––––––––––––––––– –––––––––––––––––––––––––

## .. (PREP .....

Function

Start of the block for sample preparation on the 695 Autosampler.

Description

The

(PREP

instruction opens a block for sample preparation on the

sample rack of the 695 Autosampler paralleling measurement. This block
can contain any number of instructions admissible for the sample
preparation and must be closed with the

PREP)

instruction.

The PREP block must be called up with the

>PREP

instruction. As soon

as the program running for the current sample in the measuring vessel
allows, the instructions defined in the PREP block are executed with the
following sample on the sample rack of the 695 Autosampler.

Comments

The

(PREP

instruction can be used only in operation with the 695

Autosampler and must be entered on the "OP.SEQUENCE" page.

Only one PREP block is admissible in a program.

Only the following instructions are allowed in a PREP block:

SMPL/F, CSOLN/F, DOS>F, SDOS>F, RADD>F
DOS>A, SDOS>A, F>A
VMIX, VWASH
BEEP, NOP, REM, SCANCTRL, SETCTRL

A PREP block runs only when the automatic series determination
(

Auto.batch = on

) on the "MONITORING" page is switched on and if

the same method is used as for the previous sample.

If the automatic transfer of sample data is switched on (

Auto.samples

= on

), the PREP block is executed with the next sample entered on

the "SAMPLES" page at the position on the sample rack specified
under

Pos.

. The sample data of this sample appear on the 2

nd

sam-

ple data line on the "MONITORING" page.

If the automatic transfer of sample data is switched off (

Auto.samples

= off

), the sample preparation block is automatically executed with

the next sample on the sample rack.

If a voltage is applied to the electrodes in the measuring vessel (by

MEAS

or

SWEEP

instructions), no instructions from the PREP block can

be executed. As the voltage is retained on completion of the

MEAS

or

SWEEP

instruction, the execution of instructions from the PREP block

within a program is not possible until the voltage has been switched
off with

ØMEAS

.

Instructions from the PREP block which need the functions of the 695
Autosampler can not be executed simultaneously with instructions
from the main program which also use such functions (e.g.

DOS>M

,

RINSE

).

Instructions of the PREP block which have not yet been executed at
the end of the program are then run to completion.