beautypg.com

5 settings on the "monitoring" page – Metrohm 746 VA Trace Analyzer User Manual

Page 101

background image

4 Introduction to the operation

746 VA Trace Analyzer / 747 VA Stand

4-16

4.2.4

Preparing the sample solution

The sample solution for the lead determination is prepared as follows:

1

Addition of 20 mL dist. water

Add 20 mL dist. or deion. water to the measuring vessel.

2

Addition of 0.5 mL KCl 3 mol/L

Add 0.5 mL potassium chloride c(KCl) = 3 mol/L to the measuring

vessel.

3

Addition of 100

µµL Pb ion standard solution

Add 100

µ

L Pb ion standard solution

ρ(Pb) = 1 g/L to the measuring

vessel (this results in 100

µ

g Pb in the measuring vessel).

4.2.5

Settings on the "MONITORING" page

Before the start of the loaded method, the sample volume must be entered on the

"MONITORING" page. Proceed as follows:

1

Switch to dialog page "MONITORING"

Press the yellow key. The dialog page "MONITORING"

appears:

Method: TESTPb MONITORING * READY *

Title : Pb determination in ion standard solution

Remark 1

Remark 2

Run mode determination Run 0

User name Stand address 1

Auto.samples off 0 of 160 Determination .dtm

Auto.batch off 0 of *

Start interval 0.0 h Modified no

Det.storage off 93.7 % free Sample table -

Pos. Ident.1/S1 Ident.2/S2 Ident.3/S3 Method.call Sample size/S0

Modify

column

Modify

line

Recalc.

Check

method

System

window

Error

window

Live

display

For the determination using the method

TESTPb

, the adjustable pa-

rameters

Run mode

,

Auto.samples

,

Auto.batch

,

Start interval

and

Det.storage

must have the values shown here. If this is not the case,

they must be changed accordingly.

The dialog page "MONITORING" is used to monitor the operation. Here, various
settings and entries for subsequent determinations can be defined. You will find a
detailed description of this dialog page in section 5.5.1.