6 run subwindow, 1 run - general, 2 run test – Metrohm tiamo 2.4 Manual User Manual
Page 145: Run subwindow, Run - general, Run test, Perform run test
■■■■■■■■■■■■■■■■■■■■■■
3 Workplace
tiamo 2.4
■■■■■■■■
129
3.6
Run subwindow
3.6.1
Run - General
Subwindow: Workplace
Run subwindow
The Run subwindow contains the controls for controlling method runs
and for administering sample data. It is always displayed in the Work-
place program part, i.e., it cannot be removed from the workplace view.
The subwindow can be enlarged and reduced as required; it can also be
maximized.
Tabs
The Run subwindow consists of the following three tabs:
■
Single determination
Control of single determinations.
■
Determination series
Control of determination series.
NOTE
If a run has been started on the Single determination tab (Status =
BUSY), then the Determination series tab is no longer accessible
(disabled). The same holds true for the Single determination tab in
the event that a run has started on the Determination series tab.
3.6.2
Run test
Menu item: Workplace
▶ Tools ▶ Run test
NOTE
In contrast to the Sample table test, which is only used to check
whether or not all sample data is correct, the Run test also checks the
required hardware.
Single determination
The menu item Tools
▶ Run test or the symbol is used to perform
the start test for the selected method. The precondition for this is that the
workplace is in READY status.
For the Run test, the dialog window Run test - 'Workplace name' -
Single determination opens, in which information concerning the test is
displayed.