HEIDENHAIN TNC 407 (243 020) Technical Manual User Manual
Page 167

•
PLC positioning with M91 or M92 is not possible when Cycle 19 "Tilt working plane" is
active
•
The "Basic rotation" feature can be executed only when the tilt axes are at their 0°
positions
•
PLC positioning commands are always executed paraxially to the machine coordinate
system. Cycle 19 therefore has no influence on PLC positioning commands.
•
Datum compensation via PLC is effective also with the "Tilt working plane" function.
MP7500
"Tilt working plane" function
Entry: 0 or 1
0 = inactive
1 = active
MP75x0
Transformed axis
Entry: %xxxxxx
Entry 0 means end of transformation sequence
Bit 0
X axis
Bit 1
Y axis
Bit 2
Z axis
Bit 3
A axis
Bit 4
B axis
Bit 5
C axis
MP75x1
Supplementary identifier for transformation
Entry: %xx
Bit 0
Swivel axis
0 = swivel head
1 = tilting table
Bit 1
Dimension in MP75x2
0 = incremental step (for swivel head)
1 = absolute
related to machine datum
(for tilting table)
MP75x2
Dimension for transformation
Entry: –99,999.9999 to +99,999.9999
Entry 0 means free rotating axis