beautypg.com

2 s scan details, Items always completed within s scan, Timesharing items – Yaskawa MP940 User Manual

Page 58

background image

3.3 Scan Processing

3-11

3

3.3.2 S Scan Details

The following diagram shows the internal processing and order of processing of an S scan.

„

Items Always Completed within S Scan

„

Timesharing Items

C

N

T

R

L

I

O

HS

SS

BG

R

I

O

C

O

M

R

I

O

SA

HA

LA

S scan cycle (0.5, 1.0, 2.0, or 4.0 ms)

Required

(always completed within scan)

With time limit

(If not completed within 1 scan,

will be executed in next scan.)

Remain-

der

Timer

Back-

ground

pro-

cessing

C

N

T

R

L

I

O

HS

SS

SA

S-scan application (DWG.S)

S-scan system processing

(SVA control loop, etc.)
H-scan system processing (SVA acceleration/

deceleration processing, etc.) (Executed once for

each H scan cycle.)
Local I/O processing (DI/DO/AI/AO)

R

I

O

C

O

M

R

I

O

HA

LA

L-scan application (DWG.L)

H-scan application (DWG.H)

Distributed I/O (MECHATROLINK)

processing (synchronized to either

H or L scan)
Serial communications