Test Procedure Pan and Zoom Controls
Procedure run
When the test is loaded, you use the control panel to perform primary hardware and test control operations.
When you click Run, the test procedure begins. If the procedure is stopped before completion, you can
resume the test from where it stopped.
To troubleshoot procedures, you can include the Test Procedure in the test-run display to monitor test
progress.
An operator can follow the progress of a test as the test-run display indicates the current test activity. A
green triangle indicates the current activities. A blue check mark indicates completed activities.
Test-Run Progress
Procedure activities
Activities are the building blocks for test procedures. To add an activity to a procedure, click the activity in
the toolbox and drag it to a location in the procedure marked with a green plus sign. If it is the first activity
being added, drag the icon to the Drop Activities Here area.
The types of procedure activities include:
•
Operator messages and operator input
•
Conditional and parallel processing
•
Parameter input and variable handling
•
Command generation
MTS TestSuite | 597
Test-Run Displays