Test run status panel – MTS Multipurpose Elite User Manual
Page 615
Description
Item
Note:
Unload shows only the first available control
mode for the channel.
This column is a list of the available channels (test
station resources) that can be used with the park and
unload functions.
Channel
Enable or disable the park or unload function for the
corresponding channel.
Enabled
Set the target end level for the enabled channels
when the Park or Unload button is clicked.
End Level
Display the default units for the channel’s End Level
value.
Unit
Test Run Status Panel
The Test Run Status panel shows the test run state, test run name, status, control mode, and the current
running time of the test.
Test Run Status Panel Description
Description
Item
Stop the procedure. This button becomes active when a test is in the
Initialized or Stopped status and a test run is selected. The button is
Stop
inactive when the status is Running or Complete. The button is inactive
when a test run is not selected. To make the button active when a
test is running, click Stop or Stop At.
When you click the Stop the procedure button, the arrow changes
color. The application panel and test panel buttons become
unavailable. The Results tab appears. The status is Stopped.
Start the procedure. This button becomes active when you click the
Stop button. The status is Stopped.
Start
When you click the Start button, a message prompts you to click Yes
to save the project and continue the test or to click No. If you click
Yes, the button changes color. The status is Stopped. The Run and
Stop buttons become active.
If you click No, the test status remains unchanged and the Start button
remains active.
MTS TestSuite | 615
Running Tests