beautypg.com

Configuring frame and modular gpis, Frame and modular relays, Configuring frame and modular gpis -40 – Clear-Com Eclipse-Omega User Manual

Page 150: Frame and modular relays -40

background image

Clear-Com

Eclipse Configuration Software Instruction Manual

5 - 4 0

3. The GPI module with the highest module number will be removed

from the list and all the GPIs on that module will be deleted.

CONFIGURING FRAME AND MODULAR GPIS

1. To configure either a Frame or GPI-6 input, identify the input number

to be used from the ‘Frame and Modular GPIs’ screen.

2. Highlight the row by left clicking the row.
3. From the ‘Advanced Settings’ window identify the required talk label.
4. Place a tick in the ‘IsAttached’ check box next to the required talk

label.

5. To detach the talk label from the GPI uncheck the ‘Triggers’ box

next to the talk label.

6. To configure the properties of a talk label attached to a GPI open the

Control Manager using the link below the ‘Advanced Settings’
window.

7. Select the required Talk or Listen label by left clicking the row.
8. In the ‘Properties’ pane configure the required properties for the Talk

or Listen label.

Note: When using an IMF-3 frame the GPI-6 cable should be

connected first to the matrix GPI data connector before
connecting any GPI-6 cards.

FRAME AND MODULAR RELAYS

The Eclipse Frame has 8 Frame General Purpose Outputs (GPO) and
these Outputs are automatically added to ECS in the ‘Cards and Ports’
screen as module 0. RLY-6 modules are added/removed from the
‘Cards and Ports’ screen.

This manual is related to the following products: