3 ) zero point return (zret), A ] operating procedure – Yaskawa MP2200 Machine Controller User Manual
Page 439

8.3 Motion Commands
8-23
( 3 ) Zero Point Return (ZRET)
When a ZRET command is executed, the zero point return will be completed immediately. Position
information will not be updated.
[ a ] Operating Procedure
(
Note) The following position information is updated when command execution is
completed.
• Machine Coordinate Target Position (TPOS) (IL0E) = Zero Point Offset (ABSOFF)
(OL48)
• Target Position (CPOS) (IL10) = Zero Point Offset (ABSOFF) (OL48)
• Machine Coordinate System Position (MPOS) (IL12) = Zero Point Offset (ABSOFF)
(OL48)
• Machine Coordinate Feedback Position (APOS) (IL16) = Zero Point Offset (ABSOFF)
(OL48)
No.
Execution Conditions
Confirmation Method
1
There are no alarms.
Both IL02 and IL04 are 0.
2
The Servo ON condition.
IB001 is ON.
3
Motion command execution has been completed.
IW08 is 0 and IB090 is OFF.
Execute the zero point return (ZRET) motion
command.
• Set OW08 to 3.
Zero point return operation starts.
• IW08 will be 3 during execution.
Zero point return operation completed.
• IB0C5 will turn ON.
Execute NOP motion command.
• Set OW08 to 0.
OW
08 = 3 (ZRET)
IW
08 = 3 (ZRET)
IB
090 (BUSY)
IB
098 (COMPLETE)
IB
0C0 (DEN)
IB
0C1 (POSCOMP)
IB
0C3 (NEAR)
IB
0C4 (ZERO)
IB
0C5 (ZRNC)
One scan