Pm designer operation manual – B&B Electronics WOP-2121V-N4AE - Manual User Manual
Page 251

4
7
PM Designer Operation Manual
7-7
CHAPTER 7 DISPLAYING AND INPUTTING DATA
Property
Description
Operator 
Confirmation
Check this option if you want the operator to confirm what he/she enters for the 
numeric entry. The Confirmation box will be displayed when a value is entered for the 
numeric entry. If the operator selects “Yes” in the Confirmation box, the numeric entry 
will write the entered value to the specified variable. If the operator selects “No” or the 
operator does not respond within the specified time period (Maximum Waiting Time), 
the numeric entry will cancel the data entry operation.
Operator 
Confirmation
Maximum 
Waiting Time
Specifies the maximum time that the numeric entry will wait for the operator’s 
confirmation. The data entry will be cancelled if the operator does not respond within 
this time.
Operation 
Logging
Check this option so the following three items will be recorded in the operation log 
when the numeric entry outputs the entered value.
There are three recorded items:
1) The time when the operation is performed
2) The entered value
3) The predefined operation message
Message
Enter the operation message of the first language here.
Operation 
Logging
Click this button to bring up the Operation Message dialog box that you can edit the 
operation message for all the languages.
