Metrohm tiamo 2.1 (ProcessLab) User Manual
Page 143
■■■■■■■■■■■■■■■■■■■■■■
3 Workplace
tiamo 2.1 (ProcessLab)
■■■■■■■■
127
■
Check sample data
Check whether the sample data entered corresponds to the defined
method variables and is valid.
■
Assign determination ID
A unique determination ID is assigned for the determination.
■
Reserve devices (modules)
The devices and/or their function units used by the device-dependent
commands in the method are reserved for the duration of the determi-
nation, i.e. they can neither be used in other workplaces nor can they be
operated manually.
■
Increasing sample number
The sample number is increased by +1.
■
Increasing statistics counter
If Statistics is switched on, both in the START command and on the
Single determination tab, then the statistics counter will be increased
by +1. If a new method has been loaded or if the statistics counter cor-
responds to the setpoint counter, then the current statistics data is
deleted beforehand and the statistics counter is set to 0.
6 - Main procedure
The following actions can be carried out during processing of the method
loaded:
■
Processing the main track
The status switches to BUSY after the start of the main track. The main
track commands and those of the other tracks it calls up are processed
in sequence. If tracks which are not free are called up by the main track,
then a waiting period will be observed until these tracks can be started.
■
Interrupt and continue run
A determination that is running can be interrupted at any time with
[Hold] and resumed with [Cont]. All active tracks are interrupted and
resumed together when this is done.
■
Cancel run
A determination that is running can be canceled at any time with
[Stop]. The exit track (if present) is run afterwards and the determination
is stopped.
■
Stop by error
If an error occurs while a determination is running that causes the deter-
mination to be interrupted, then the error track will be run (if present)
and the determination will be ended.
■
Processing exit track
If the main track and all of the tracks that it has called up are finished,
then the exit track (if present) will be run and the determination finished.
The status switches to READY after the end of the main track.