Configurator

CP Output Set

5−96

VM 3000 Installation and Operating Manual

Multiple Switcher Installations

Please refer to Figure 5−76 for the following discussion.

When more than one switcher is in the system, and you want to operate the switchers from one control panel, there must be

a separate CP Level Set for each switcher ( [1] and [2]

). This is because the CP Level Set is used to determine how status

will be shown on the panel; specifically, the first entry on the CP Level Set will be the level that is statused. In this example,
video will be statused.

The CP Output Set is used to assign an individual output to a CP Level Set for the appropriate switcher [4]. In this example,
all outputs of the “NewsRout”switcher would be assigned to the CP Level Set named “2000−LEV.”

Similarly, all outputs of the “MainRout” switcher could be assigned to a CP Level Set on an output−by−output basis, but in
this example the Lev Set entry is blank. With no entry, the system will refer back to the MPK Devices table to locate the default
CP Level Set—in this case, “KXYZ−LEV” [3]. Thus the “KXYZ−LEV” table will be used to establish “MainRout” status
[2].