Hardware preparation and installation, 1 unpacking and inspecting the blade, Chapter 2 – Artesyn ATCA-8310 Installation and Use (May 2014) User Manual
Page 41
Chapter 2
ATCA-8310 Installation and Use (6806800M72E)
41
Hardware Preparation and Installation
2.1
Unpacking and Inspecting the Blade
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
Printed Quick Start Guide and Safety Notes Summary
ATCA-8310 blade
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
3. Remove the desiccant bag shipped together with the blade and dispose of it
according to your country’s legislation.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
The blade is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service immediately.