Metrohm viva 1.1 (ProLab) User Manual
Page 912
7.8 RS-232 device
■■■■■■■■■■■■■■■■■■■■■■
900
■■■■■■■■
viva 1.1 (for process analysis)
Next GLP test
Date on which the next GLP test is to be carried out. The date can be
selected by clicking on
in the Select date dialog window (see Chap-
ter 2.4.1, page 77). After the date has been entered, the GLP test inter-
val field will be adjusted automatically.
Only editable if monitoring is switched on.
Default value
GLP test date + 999 days
Message
The message options can only be edited if monitoring is switched on.
Message by e-mail
on | off (Default value: off)
The message is sent to the address defined under [E-mail...] if this check
box is activated. The message is sent in text format.
[E-mail...]
[E-mail...] opens the Send e-mail window (see Chapter 2.5.1, page 79).
Acoustic signal
on | off (Default value: off)
If this check box is activated, an acoustic signal will be emitted in addition
to the message.
Action
The actions can only be edited if monitoring is switched on.
If it is found during monitoring that the validity period has expired, then
one of the following actions will be triggered automatically during the
start test:
Selection
Document message only | Display and docu-
ment message | Do not start the determina-
tion
Default value
Display and document message
Document message only
The message that the validity period has expired will be automatically
saved with the determination.
Display and document message
A message is displayed and you can select whether you want to con-
tinue the run or cancel it. If the run is continued then the message that
the validity period has expired will be automatically saved with the
determination.