7 call electrolyte, 1 call electrolyte - overview, Call electrolyte – Metrohm viva 1.1 (ProLab) User Manual
Page 435
■■■■■■■■■■■■■■■■■■■■■■
5 Method
viva 1.1 (for process analysis)
■■■■■■■■
423
Condition
on | off (Default value: off)
If this check box is activated, the defined action will be triggered if the
evaluation of the condition yields the result 1 (= true).
Condition
Expression for the condition(s) that can be created or edited with the for-
mula editor after clicking on
or by double-clicking in the text field (see
Entry
1,000 characters
Default value
'empty'
Action
Definition of the action that is to be executed if this stop criterion is ful-
filled.
Selection
Cancel command | Cancel determination | Can-
cel determination and series
Cancel command
The running command CALL COND is canceled, afterwards the next
command is started in the track.
Cancel determination
The ongoing determination is canceled, after which the next determi-
nation in the series is started (any exit track that may be present is exe-
cuted, any error track that may be present is not executed).
Cancel determination and series
The ongoing determination is canceled, the next determination in the
series will no longer be started (any exit track that may be present is
executed, any error track that may be present is not executed).
5.5.2.2.7
CALL ELECTROLYTE
5.5.2.2.7.1
CALL ELECTROLYTE - Overview
Dialog window: Method
▶ CALL ELECTROLYTE ▶ Properties... ▶ CALL ELECTRO-
LYTE - 'Command name'
Command for calling a VA track. The data acquired in the called VA
track is used in the RC (Response Curve) (see Glossary, page 1056) cali-
bration method for the determination of additives with a suppressing
effect (e.g. leveler) (see Glossary, page 1054). As an option, you can for-
mulate a condition that must be fulfilled so that the CALL ELECTRO-
LYTE command is executed.
Appearance
The command has the following appearance: