Festo Кабели и принадлежности User Manual
Page 451
C. Technical appendix
C−5
Festo P.BE−SPC200−EN en 0901d
Wait
ţ 10 s
Initialization phase
Switch on the operating
voltage and load voltage at
the same time
Set ENABLE
Switch on the load voltage
Wait
ţ 1 s
Create readiness to operate
Wait
ţ 10 s
Reset:
ćăENABLE
ćăSTOP
ćăRESET or START/RESET
Switch on the operating
voltage
1
Switch on
operating and load
voltage supplies
at the same
time?
Yes
No
1
2
2
2
1
Operating and load voltage supplies of the SPC200
2
Each voltage must be stable 24 V DC −5/+25 %
Fig. C/1:
Create readiness to operate
This manual is related to the following products: