beautypg.com

Test and diagnostic functions of the control panel – Festo Кабели и принадлежности User Manual

Page 264

background image

6. Operating the SPC200 with the control panel

6−52

Festo P.BE−SPC200−EN en 0901d

6.8

Test and diagnostic functions of the control panel

A ready−to−operate system is required for some of the
commands in this menu. The following conditions must be
fulfilled:

·

the positioning system must be set up completely, wired
and supplied with power and compressed air

·

the axis and application data must be set correctly

·

the inputs ENABLE and STOP must supply a 1−signal.

After opening the menu you can select whether you wish to
test the:

ć

system functions (SYSTEM) or

ć

the axis functions (AXIS).