beautypg.com

C.1 sequence plans for the programmer, C.1.1 creating readiness to operate, Sequence plans for the programmer – Festo Кабели и принадлежности User Manual

Page 449: C.1.1, Creating readiness to operate

background image

C. Technical appendix

C−3

Festo P.BE−SPC200−EN en 0901d

C.1

Sequence plans for the programmer

The following sequence plans will support you in programĆ
ming a higher−order PLC/IPC. They show you how to:

ć

create readiness to operate

ć

start NC records in Record Select mode

ć

start NC programs in Start/Stop mode

ć

quit fault.

The signal names are printed in upper−case letters.
For example: READY stands for READY signal, 1 stands for
1−signal, 0 stands for 0−signal.

C.1.1

Creating readiness to operate

When the operating voltage is switched on, the SPC200
carries out the initialization and self−test of the connected
modules. This initialization phase can take a certain amount
of time (max. 10 seconds), depending on the equipment fitted
on the system.

Please note
During this initialization phase no further rising signal edge
may be created at the Start/Reset input.

After the initialization phase there may be a fault (e.g. hardĆ
ware fault) even if the READY output supplies a 1−signal for a
brief period. Therefore when the 1−signal is first recognized at
the READY output, you must wait another

ţ 100 ms. The sigĆ

nal at the READY output must then be scanned again for a
1−signal (see sequence plan Create readiness to operate").