beautypg.com

Festo Кабели и принадлежности User Manual

Page 109

background image

3. Installation

3−31

Festo P.BE−SPC200−EN en 0901d

The following diagram shows the pin assignment of the
operating voltage connection on the power supply module.

Pin 1: 24 L
Pin 2: 24 V
Pin 3: 0 V

1

2

1

Pin assignment:
Pin 1 (24 L):

24 V load voltage (can be switched off separately)

Pin 2 (24 V):

24 V supply for internal electronics

Pin 3 (0 V):

0 V

2

Earth connection (M4 thread)

Fig. 3/8:

Operating voltage connection (X2)

Earth connection

The SPC200 is provided with earth connections on the left
and right−hand sides of the rack.

Please note
Connect one of the earth cables of the SPC200 with low
impedance (short cable with large cross−sectional area) to
the earth potential.

In this way, you will avoid interference caused by electromagĆ
netic influences.