Apply Power and Verify Operation
Apply Power and Verify Operation
1. Apply –48 VDC power to Access Navigator and verify the following front panel status indications
(see Figure 6-26).
Requirement:
CONTROLLER A POWER indicator lights green.
Requirement:
CONTROLLER A ACTIVE indicator lights green.
2. If second (redundant) controller is present, verify the following front panel status indications.
Requirement:
CONTROLLER B POWER indicator lights green.
Requirement:
CONTROLLER B ACTIVE indicator is off.
NOTE:
If power indicators do not light, check power connections (see DC Power
).