Acceptance test, Verification summary, Acceptance test -39 – Carrier Access Access Navigator User Manual
Page 143: Verification summary -39

Access Navigator - Release 1.8
August 2003
6-39
Electrical
Installation
Acceptance Test
Acceptance Test
Verification Summary
n
Apply Power and Verify Operation
n
Verify Chassis Ground Connection
n
n
Verify RS-232 Management Connection
n
Verify Ethernet Cable Connection
n
Verify Ethernet Management Connection
n
n
Verify Alarm Output Connections
n
Verify Alarm Input Connections
n
NOTE:
If connections appear to be correct but unit fails the verification requirements,
refer to Diagnostics & Troubleshooting on