2 servopack inspection, Part replacement schedule, Operating conditions – Yaskawa Large Capacity Sigma II Series User Manual
Page 342

8.1 Servodrive Inspection and Maintenance
8-3
8
8.1.2 SERVOPACK Inspection
For inspection and maintenance of the SERVOPACK, follow the inspection procedures in
the following table at least once every year. Other routine inspections are not required.
Part Replacement Schedule
The following parts are subject to mechanical wear or deterioration over time. To avoid fail-
ure, replace these parts at the frequency indicated.
The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the standard set-
tings before shipping. Be sure to confirm that the parameters are properly set before starting
operation.
Operating Conditions:
• Ambient Temperature: Annual average of 30
°C
• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.
Table 8.2 SERVOPACK Inspections
Item
Frequency
Procedure
Comments
Clean Interior
and Circuit
Boards
At least once a
year
Check for dust, dirt, and oil
on the surfaces.
Clean with compressed air
or cloth.
Loose Screws
At least once a
year
Check for loose terminal
block and connector
screws.
Tighten any loose screws.
Defective Parts
in Unit or on Cir-
cuit Boards
At least once a
year
Check for discoloration,
damage or discontinuities
due to heating.
Contact your Yaskawa rep-
resentative.
Table 8.3 Periodical Part Replacement
Part
Standard Replace-
ment Period
Replacement Method
Cooling Fan
4 to 5 years
Replace with new part.
Smoothing Capacitor
7 to 8 years
Test. Replace with new part.
Relays
-
Test. Replace if necessary.
Fuse
10 years
Replace with new part.
Aluminum
Electrolytic
Capacitor on
Circuit Board
5 years
Test. Replace with new circuit board if neces-
sary.