beautypg.com

2 servopack inspection, Part replacement schedule, Operating conditions – Yaskawa Large Capacity Sigma II Series User Manual

Page 342

background image

8.1 Servodrive Inspection and Maintenance

8-3

8

8.1.2 SERVOPACK Inspection

For inspection and maintenance of the SERVOPACK, follow the inspection procedures in
the following table at least once every year. Other routine inspections are not required.

„

Part Replacement Schedule

The following parts are subject to mechanical wear or deterioration over time. To avoid fail-
ure, replace these parts at the frequency indicated.

The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the standard set-
tings before shipping. Be sure to confirm that the parameters are properly set before starting
operation.

Operating Conditions:

• Ambient Temperature: Annual average of 30

°C

• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.

Table 8.2 SERVOPACK Inspections

Item

Frequency

Procedure

Comments

Clean Interior
and Circuit
Boards

At least once a
year

Check for dust, dirt, and oil
on the surfaces.

Clean with compressed air
or cloth.

Loose Screws

At least once a
year

Check for loose terminal
block and connector
screws.

Tighten any loose screws.

Defective Parts
in Unit or on Cir-
cuit Boards

At least once a
year

Check for discoloration,
damage or discontinuities
due to heating.

Contact your Yaskawa rep-
resentative.

Table 8.3 Periodical Part Replacement

Part

Standard Replace-

ment Period

Replacement Method

Cooling Fan

4 to 5 years

Replace with new part.

Smoothing Capacitor

7 to 8 years

Test. Replace with new part.

Relays

-

Test. Replace if necessary.

Fuse

10 years

Replace with new part.

Aluminum
Electrolytic
Capacitor on
Circuit Board

5 years

Test. Replace with new circuit board if neces-
sary.