beautypg.com

Chapter 2, Installation and wiring, Introduction – Rockwell Automation 592- E300 Overload Relay User Manual User Manual

Page 21: Receiving, Unpacking/inspecting, Storing, Chapter

background image

Rockwell Automation Publication 193-UM015B-EN-P - June 2014

21

Chapter

2

Installation and Wiring

Introduction

This chapter provides instructions for receiving, unpacking, inspecting, and
storing the E300™ Electronic Overload Relay. Assembly, installation, and wiring
instructions for common applications are also included in this chapter.

Receiving

It is the responsibility of the user to thoroughly inspect the equipment before
accepting the shipment from the freight company. Check the item(s) received
against the purchase order. If any items are damaged, it is the responsibility of the
user not to accept delivery until the freight agent has noted the damage on the
freight bill. Should any concealed damage be found during unpacking, it is again
the responsibility of the user to notify the freight agent. The shipping container
must be left intact and the freight agent should be requested to make a visual
inspection of the equipment.

Unpacking/Inspecting

Remove all packing material from around the E300 Electronic Overload Relay.
After unpacking, check the item’s nameplate catalog number against the purchase
order.

Storing

The E300 Electronic Overload Relay should remain in its shipping container
prior to installation. If the equipment is not to be used for a period of time, it
must be stored according to the following instructions in order to maintain
warranty coverage:

Store in a clean, dry location.

Store within an ambient temperature range 
of -40…+85 °C (-40…+185 °F).

Store within a relative humidity range of 0…95%, non-condensing.

Do not store where the device could be exposed to a corrosive atmosphere.

Do not store in a construction area.

This manual is related to the following products: