Rockwell Automation 20D-MDI-C1 Multi-Device Interface Option Board for PowerFlex 700S Drives User Manual
Rockwell Automation Equipment
Installation Instructions
Multi-Device Interface Option Board for
PowerFlex® 700S Drives
What This Kit Contains
Verify that your kit contains the items listed in the following table. If your
kit does not contain the correct items, contact your Rockwell Automation
sales representative.
!
ATTENTION: To avoid an electric shock hazard, ensure that
all power to the drive has been removed before performing the
following.
!
ATTENTION: To avoid an electric shock hazard, verify that
the voltage on the bus capacitors has discharged before
performing any work on the drive. Measure the DC bus voltage
at the DC+ & DC- terminals. The voltage must be zero.
!
ATTENTION: HOT surfaces can cause severe burns. Do not
touch the heatsink surface during operation of the drive. After
disconnecting power allow time for cooling.
!
ATTENTION: This drive contains ESD (Electrostatic
Discharge) sensitive parts and assemblies. Static control
precautions are required when installing, testing, servicing or
repairing this assembly. Component damage may result if ESD
control procedures are not followed. If you are not familiar with
static control procedures, reference A-B publication 8000-4.5.2,
“Guarding Against Electrostatic Damage” or any other
applicable ESD protection handbook.
!
ATTENTION: Hazard of permanent eye damage exists when
using optical transmission equipment. This product emits intense
light and invisible radiation. Do not look into SynchLink
fiber-optic ports or SynchLink fiber-optic cable connectors.
!
ATTENTION: The sheet metal cover and mounting screws on
the ASIC Board located on the power structure are energized at
(-) DC bus potential high voltage. Risk of electrical shock,
injury, or death exists if someone comes in contact with the
assembly.
Quantity:
Description
1
MDI Option circuit board
2
“Stacker” connectors
1
Screw
3
Stand-offs
Document Outline
- Front Cover
- What This Kit Contains
- Tools That You Need
- What You Need to Do
- Step 1: Remove Power from the Drive
- Step 2: Remove the Drive Cover(s)
- Step 3: Remove the Control Assembly from Phase I Drive (if necessary)
- Step 4: Remove the Phase II Control Cassette Covers
- Step 5: Remove the Existing MDI Option Board
- Step 6: Install the New MDI Option Board
- Step 7: Install the Control Assembly on a Phase I Drive (if removed in Step 3)
- Step 8: Wire the MDI Option Board
- Step 9: Install the Phase II Control Cassette Covers
- Step 10: Document the Change
- Step 11: Install the Drive Cover(s)
- Specifications
- Pub. No. - Date