2 subtraction, Subtraction, Subtraction (-) – Metrohm tiamo 2.3 (process analysis) User Manual
Page 73
■■■■■■■■■■■■■■■■■■■■■■
2 General program functions
tiamo 2.3 (for Process Analysis)
■■■■■■■■
57
Operand1
Operand2
Result
Example
Remark
Number
Text
Text
1.2 + "Metrohm" = "1.2Metrohm"
-
Text
Number
Text
"Metrohm" + 1.2 = "Metrohm1.2"
-
Number
Time
Number
2.0 + Time(1999;11;7) = 36472.96
(for UTC+1)
Result: Number of days calculated
from December 1899, dependent
on the system time
Time
Number
Number
Time(1999;10;7) + 2.0 = 36441.92
(for UTC+2)
Result: Number of days calculated
from December 1899, dependent
on the system time
Text
Time
Text
"Metrohm" + Time(1999;10;7) =
"Metrohm1999-10-07 00:00:00
UTC+2"
Before the operation, the operand
of the type Date/Time is conver-
ted to Text.
Time
Text
Text
Time(1999;01;7) + "Metrohm" =
"1999-01-07 00:00:00 UTC
+1Metrohm"
The same rules apply here as for
the previous operation.
2.4.4.2.2
Subtraction
Dialog window: Formula editor
▶ Operators/Functions
Syntax
Operand1 - Operand2
The operands can be entered either directly or as a variable and can be of
the type Text, Number or Date/Time.
Examples
Operand1
Operand2
Result
Example
Remark
both operands of the same type:
Number
Number
Number
1.2 - 3 = -1.8
-
Text
Text
Text
"Metrohm" - "AG" = invalid
This operation is not allowed.
Time
Time
Number
Time(1998;01;06) -
Time(1964;12;03) = 12'087.00 (for
UTC+1)
Result: Number of days calculated
from December 1899, dependent
on the system time
Operand of different type: The operand which does not correspond to the result type is converted to the relevant
result type before the operation.
Number
Text
Text
1.2 - "Metrohm" = invalid
This operation is not allowed.
Text
Number
Text
"Metrohm" - 1.2 = not valid
This operation is not allowed.
Number
Time
Number
2.0 - Time(1999;10;7) =
-36'437.917 (for UTC+2)
Result: Number of days calculated
from December 1899, dependent
on the system time