10 print sample table (pdf) – Metrohm tiamo 2.3 (process analysis) User Manual
Page 181
■■■■■■■■■■■■■■■■■■■■■■
3 Workplace
tiamo 2.3 (for Process Analysis)
■■■■■■■■
165
For the Run test, the dialog window Run test - 'Workplace name' -
Single determination opens, in which information concerning the test is
displayed.
Method
Displays the method for the single determination.
Determination series
The menu items Tools
▶ Run test or [Sample table] ▶ Run test… or
the symbol are used to perform the Start test. The precondition for this
is that the workplace is in READY status. The Start test is however per-
formed only for the number of lines defined under Autostart.
For the Run test, the dialog window Run test - 'Workplace name' -
Determination series opens, in which information concerning the test is
displayed.
Line
Displays the line number of the currently tested sample data line for the
determination series.
Status displays
One of the following status displays appears underneath the line number:
Selection
Run test running… | Run test error | Run test
finished without errors
Run test running…
This display appears during the test run. A progress bar also appears;
the test can be interrupted thereby by means of the [x] next to the bar.
Run test error
This display appears if an error has occurred during the run test. During
a determination series, the user can determine, on the basis of the line
number displayed, the line to which the the error message belongs
that appeared at the time of the error and that is currently displayed in
the usual message window.
Run test finished without errors
This display appears at the end of a run test that has been completed
without errors.
3.6.4.9.10
Print sample table (PDF)
Dialog window: Workplace
▶ Sample table / Determination series ▶ [Sample
table]
▶ Print (PDF)… ▶ Print sample table (PDF)
The output format for the PDF output can be selected in this dialog win-
dow.