4 meas t - evaluations, Evaluations – Metrohm tiamo 2.3 (process analysis) User Manual
Page 1009
■■■■■■■■■■■■■■■■■■■■■■
5 Method
tiamo 2.3 (for Process Analysis)
■■■■■■■■
993
5.6.4.7.4
MEAS T - Evaluations
Tab: Method
▶ MEAS T ▶ Properties... ▶ Evaluations
Command name
Name of the command.
Input
25 characters
The following additional methods for evaluation of measurement curves
can be activated and defined on this tab.
Fixed endpoint evaluation
Fix endpoint evaluation
on | off (Default value: off)
If this option is activated, then the associated values for the other meas-
ured quantities will be interpolated with a fix measured quantity (Meas-
ured value or Time) for the fix endpoint from the measuring point list.
Moves the selected line up (changes the sequence).
Moves the selected line down (changes the sequence).
[New]
Open the dialog window Fixed endpoint evaluation # to enter a new
fixed endpoint (see Chapter 5.6.4.7.6, page 997).
[Properties]
Open the dialog window Fixed endpoint evaluation # to edit the fixed
endpoint selected in the table (see Chapter 5.6.4.7.6, page 997).
[Delete]
Delete the selected line.
Minimum evaluation
Minimum evaluation
on | off (Default value: off)
If this option is activated, then the associated time for the minimum meas-
ured value will be interpolated from the measuring point list.
Threshold value
The evaluation of the minimum begins as soon as the slope of the curve
exceeds the set threshold value.