beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 412

background image

412

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

Chapter 13 Time of Day Control

2.

Click on the load number to launch the numeric keypad.

3.

Select a load to configure by entering the load number, then clicking Enter.

4.

Click on the load description.

5.

Enter a description for the load and then click Enter.

The Save Day Changes button will turn yellow indicating changes have
been made that have not been saved.

6.

Click the Save Day Changes button.

7.

To configure the schedule for the load, click on each day of the week and
enter the desired schedule.

Be sure to click the Save Day Changes button after entering the schedule for
each day. If a new day is selected prior to saving the schedule for the
displayed day, the changes will be lost.