beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 202

background image

202

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

Chapter 10 FactoryTalk EnergyMetrix Software and PowerMonitor Device Maintenance

7.

In the design view, drag and drop the
following from the Toolbox into the blank
plan page:
Back Up Database Task
Shrink Database Task
Maintenance Cleanup Task

8.

Select the Back Up Database Task box, then
select the tip of the green arrow and drag it
to the Shrink Database Task Box.

9.

In the same way, connect the Shrink
Database Task to the Maintenance Cleanup
Task.

10.

Select the Back Up Database Task.
a. Right-click and choose Edit.
b. Choose the EMMA database.
c. Accept the remaining defaults and click OK.

11.

In the same way, choose the EMMA database in the Shrink Database Task.