beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 221

background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

221

FactoryTalk View ME Energy Faceplates

Chapter 11

11. Click Yes when prompted to continue with the copy

operation.

12. Click OK at the bottom of the RSLinx Enterprise

dialog box to save the communication setup
changes.

Import and Configure HMI Tags

Because a controller is not used with the faceplate, HMI tags are required to control visibility animation and edit custom
properties. You will now import the tags needed to interface with the PowerMonitor 1000 faceplate in FactoryTalk View
Studio for Machine Edition.

1. From the Tools menu, choose Tag Import and

Export wizard.

2. Choose Import FactoryTalk View tag CSV files

from the pull-down menu, then click Next.

3. Click the ellipse icon to browse for the

FactoryTalk View ME project (.med) you want
to import tags into.