beautypg.com

Hmi integration, Configure alarms – Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 402

background image

402

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

Chapter 13 Time of Day Control

HMI Integration

These next sections show you how to integrate the HMI into your system.

Add TOD Faceplate to FactoryTalk View ME Application

Follow these steps to add a Time of Day (TOD) faceplate to a
FactoryTalk View ME application.

1.

Launch FactoryTalk View Studio for Machine Edition.

2.

Create a new or open an existing application to which you want
to add the Time of Day Control faceplate.

3.

Expand the graphics folder in the explorer window, right-click
on the displays folder, and choose Add Component into
Application.

4.

Browse to and open the ME TOD Control Faceplate Files folder
on the Energy Management Accelerator Toolkit CD image.

C:\Program Files\RA_Simplification\EMAT\Files\Faceplate
Files\ME TOD Control Faceplate Files

5.

Choose the ME_TOD_Faceplate.gfx file and click Open.

Configure Alarms

Follow these steps to configure alarms.

1.

Expand the Alarms folder in the system tree.

2.

Right-click Alarm Setup and choose Import and Export.

3.

Select Import alarm configuration into application.

4.

Click Next.