beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 149

background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

149

FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7

The tag just entered should
appear on the Meter Setup
tab.

For this example, you should
see these tags.

14.

Click the Meter Data tab to verify that the meter data
is being logged.

The data will not appear until the next logging
interval has occurred.

Another way to check the data is to return to the
Meter Setup tab and click the Read device tags link
just above the list of meter tags.

You can click Current Date/Time to refresh the data.

15.

Repeat steps 1…14 to assign other energy meter tags to L2x analog or digital inputs.

Refer to the Energy Data Worksheet for the appropriate meter tag names.

For this

Efficient Industries Plant 1

example, you will assign meter tags to the Fuel Oil, Propane, and Steam Flow

meters by using the information in the table.

Meter Name

Meter Tag Name

Value Type

Address

Tag Format

Roller value

Fuel Oil Meter

Fuel Oil Usage

Fuel Oil Usage

F10:1

32-bit Floating Point

10,000,000

Propane Meter

Propane Usage

Propane Usage

F10:2

32-bit Floating Point

10,000,000

Steam Flow Meter

Steam Usage

Steam Usage

F10:3

32-bit Floating Point

10,000,000