beautypg.com

Configure load inputs and outputs – Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 399

background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

399

Time of Day Control Chapter 13

2.

Expand the Tasks folder in your Controller Organizer, right click the Main Task
folder, and select Import Program.

3.

Browse to and open the TOD Control Logic folder on the Energy
Management Accelerator Toolkit CD image.

C:\Program Files\RA_Simplification\EMAT\Files\TOD Control
Logic

4.

Select the TOD_Program.L5x file, and click Import.

The Import Configuration dialog appears.

5.

Leave the program properties at the default; click OK to create
the TOD_program.

6.

The new TOD_program should appear in the Controller
Organizer within the Main Task folder.

Configure Load Inputs and Outputs

Follow these steps to configure the load inputs and outputs.

1.

Expand the TOD_Program and double-click MainRoutine.

Rungs 3 through 34 have been configured for I/O mapping.