beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 137

background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

137

FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7

7.

Click Add when the screen refreshes.

8.

Repeat steps 4…7 to add the remaining tags:
Reactive Energy Net
Real Power Demand

These are typical tags for electric meters.

9.

When done, click the Return to meter screens
link or the meter tag.

The tags just entered should
appear on the Meter Setup
tab.

For this example, you should
see these tags.

10.

Click the Meter Data tab to verify that the
meter data is being logged.

The data will not appear until the next
logging interval has occurred.

Another way to check the data is to return
to the Meter Setup tab and click the Read
device tags link just above the list of meter
tags.

You can click Current Date/Time to refresh
the data.