beautypg.com

Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 228

background image

228

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

Chapter 11

FactoryTalk View ME Energy Faceplates

8. Select the parameter file you created on page

225

and dick OK.

A bitmap image of the PowerMonitor 1000
device has been included with the
PowerMonitor 1000 faceplate files. You can
add this image to your project and use it as
the button image if you want.

9. Click OK to close the Goto Display push

button Properties dialog box.

10. Save your display and run the application to

verify that the PowerMonitor faceplate works
properly.

To integrate the faceplate with additional PowerMonitor 1000 meters on the plant floor, repeat all procedures under
sections

Configure PowerMonitor 1000 Faceplates

starting on page

page 217

You do not have to add the faceplate display

again or import the HMI tags. You just need to duplicate the default Faceplate tag folder and rename according to the
shortcut name.

TIP

If the Test Application function is used to verify faceplate operation, press the x key to escape test.