beautypg.com

Yaskawa MP900 Series Machine Controller for Standard Operation User Manual

Page 409

background image

Ladder Logic Programming

7.3.7 Creating Branch Circuits

7-42

7

4. Enter the register number for counting as an operand of the ON DELAY instruction.

5. Select the N.O. CONTACT instruction and then set the branches and the parallel con-

nections.

6. Enter a register number as the operand of the N.O. CONTACT instruction.

7. Enter the COIL instruction.

8. Enter the N.O. CONTACT instruction.

9. Enter the COIL instruction.

Branch, connection point, and parallel connection settings can be made when the cursor is on the time

1 0000

IB00000

005.00

[

T

]

1 0000

IB00000

005.00

[

T

]

MW00010

1 0000

IB00000

OB00000

1 0003

005.00

MW00010

[

T

]

1 0000

IB00000

OB00000

1 0003

IB00001

005.00

[

T

]

MW00010

1 0005

1 0000

IB00000

OB00000

1 0003

IB00001

005.00

[

T

]

MW00010

IB00002

1 0005

1 0000

IB00000

OB00000

1 0003

IB00001

005.00

[

T

]

MW00010

IB00002

1 0005

OB00001

INFO