beautypg.com

Echelon SmartServer 2.2 User Manual

Page 435

background image

436

Scheduling

For example, you can select 1 hour to have the log list the data point updates that have occurred in
the last 1 hour. You can then click a data point, and the trend graph by default will plot the
updates that have been recorded for the data point over the last hour. You can still browse the
updates beyond the specified time interval using the slider.

9. To clear a data point from the log and graph, right-click the data point and then click Remove on

the shortcut menu.

Tip: If you need to print this page, use the landscape format.