Rockwell Automation 193 Drives and Motion Accelerator Toolkit Quick Start User Manual
Page 165
Rockwell Automation Publication IASIMP-QS019E-EN-P - August 2013
165
System Commissioning
Chapter 6
6.
Set the following parameters:
7.
Refer to the E3 and E3 Plus Solid-state Overload Relay User Manual, publicat
, to
determine which trips and warnings to enable and which corresponding parameter limits to configure.
8.
Add the DeviceNet scanner to your network.
9.
Assign the desired name and node number for the scanner.
10.
Click the Scanlist tab.
11.
Select your E3 Plus overload relay from the Available Devices dialog box and using the arrows, move the
E3 Plus overload relay to the Scanlist dialog box.
IMPORTANT
You must set these parameters or the AOI will not verify in your Logix Designer application.
Parameter
Value
59, Output Assembly
105
60, Input Assembly
100
61, Assy Word 0 Param
21 (Param 21 supplies status of Inputs and Outputs)
62, Assy Word 1 Param
4 (Param 4 supplies Avg current)
63, Assy Word 2 Param
14 (Param 14 supplies Trip Status)
64, Assy Word 3 Param
15 (Param 15 supplies Warning Status)
- 150 Drives and Motion Accelerator Toolkit Quick Start 21G Drives and Motion Accelerator Toolkit Quick Start 20G Drives and Motion Accelerator Toolkit Quick Start 20F Drives and Motion Accelerator Toolkit Quick Start 2097 Drives and Motion Accelerator Toolkit Quick Start 2094 Drives and Motion Accelerator Toolkit Quick Start