Start-up programming & operation, Refer to start-up programming, For instructions on operating the drive – Yaskawa AC Drive-P1000 Industrial Fan User Manual
Page 107

Start-Up Programming & Operation
This chapter explains the functions of the digital operator and how to program the drive for initial
operation.
4.1 SECTION SAFETY...............................................................................................108
4.2 USING THE DIGITAL OPERATOR......................................................................109
4.3 THE DRIVE, PROGRAMMING, AND CLOCK ADJUSTMENT MODES...............114
4.4 START-UP FLOWCHART....................................................................................124
4.5 POWERING UP THE DRIVE................................................................................125
4.6 APPLICATION SELECTION.................................................................................126
4.7 AUTO-TUNING.....................................................................................................129
4.8 NO-LOAD OPERATION TEST RUN.....................................................................134
4.9 TEST RUN WITH LOAD CONNECTED...............................................................136
4.10 VERIFYING PARAMETER SETTINGS AND BACKING UP CHANGES..............137
4.11 TEST RUN CHECKLIST.......................................................................................139
4
YASKAWA SIEP YAIP1U 01B AC Drive - P1000 Technical Manual
107