L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual
Page 99

L-force | PLC Designer
Concepts and Base Components
DMS 4.1 EN 03/2011 TD29
97
Example, Project variables processing the error ID, Configuration of a visualization
element (Properties dialog), which should display the error message.
Creating a text list
• To create a text list for dynamic texts, add a 'Text List' object to the project via
command "Add Object' / Textlist" . When you have specified a list name and
confirmed the 'Add Textlist' dialog, the new list will be inserted in the POUs
window or - if currently an application is selected - in the Devices window below
the application object - and automatically be opened in the text list editor window.
• To create text list for static texts, either assign a text in Property 'Text' in category
'Texts' of a visualization object to get the text ist 'GlobalTextList' created
automatically, or add it explicitly by command Add Global Text List.
• To open an existing text list for editing, use command 'Edit Object' or perform a
double-click on the object entry. See ABOVE for how a text list is structured.
• To edit a field in the list, first select the field by a mouse-click and then perform a
further mouse-click or press
characters and close the entry by
the next/previous field.