Synchronize ilo clocks to nonstop clock, System power off, Test incident report delivery paths – HP Integrity NonStop J-Series User Manual
Page 238: Unsuppress problem incident report creation, Update running core license, Verify power fail configuration, Test incident report, Delivery paths

be changed in the OSMCONF file or extended for an action currently in progress by using the
Extend Problem Incident Report Suppression Time
action. Performing this action while the system
is already in the suppressed state resets the duration of the current suppression to the default time.
Synchronize iLO Clocks to NonStop Clock
Synchronizes the iLO clock on each Processor Blade (for NonStop BladeSystems) or Blade Element
(for NS-Series systems) to the NonStop system's clock. OSM does this automatically, once every
24 hours; this action allows you to synchronize the clocks immediately, as needed.
System Power Off
Puts Blade Elements, LSUs, and ServerNet enclosures into low power mode (FCDMs remain powered
on).
NOTE:
To power the system back on, use the
action in the OSM Low-Level
Link.
Test Incident Report Delivery Paths
This action tests the Incident Report delivery paths used for remote support of NonStop systems.
•
If you using HP Insight Remote Support Advanced for remote support, this action sends a
periodic incident report to all incident subscribers, including every member in the fault tolerant
subscriber group. OSM asks whether or not you want to delete the failed path, if one is
identified by the test. An EMS event is logged containing information on connectivity from
OSM to every member in the fault tolerant subscriber group. An Alarm is created if there is
a problem.
For more information, see Insight Remote Support Advanced for NonStop, located in the
Support and Service collection of NTL.
•
If you using the OSM Notification Director for remote support, this action sends a periodic
incident report to the primary dial-out point. If that delivery fails, it sends the IR to the backup
dial-out point (if available). An EMS event containing the delivery status of the incident report
is logged. When using the OSM ND, the option to delete the failed path has no impact.
Unsuppress Problem Incident Report Creation
Removes suppression caused by the
Suppress Problem Incident Report Creation
action. While this
suppression is automatically unsuppressed when the specified suppression time has been reached,
you can choose to end the suppression immediately using this action.
Update Running Core License
Valid only for NonStop BladeSystem NB54000c and NB56000c, this action is used when a core
license has been upgraded from 2-cores to 4-cores or when licenses for additional processors have
been added. The action instructs system software to read the new core license file and update the
core-enablement state. If the license file is valid, the action details will display the contents of the
license file. If the license file is not present, an error message instructs you to perform the
action.
Verify Power Fail Configuration
Verifies that the system is configured for Power Fail support.
238 System Resources